翻訳と辞書
Words near each other
・ Liaoxiornis
・ Liaoxipterus
・ Liaoxisaurus
・ Liaoxitriton
・ Liaoyang
・ Liaoyang (disambiguation)
・ Liaoyang County
・ Liaoyang Railway Station
・ Liaoyang TV
・ Liaoyangaspis
・ Liaoyuan
・ Liaozhong County
・ Liaozhong Railway Station
・ Liapades
・ Liapari
Liapootah Power Station
・ Liaqat Abbas Bhatti
・ Liaqat Ali (cricketer)
・ Liaqat Ali (disambiguation)
・ Liaqat Ali Bangulzai
・ Liaqat Ali Khan (mathematician)
・ Liaqat Baloch
・ Liaqat Hayat Khan
・ Liaqatpur Tehsil
・ Liaqauatpur
・ Liaquat Ahamed
・ Liaquat Ali
・ Liaquat Ali Jatoi
・ Liaquat Ali Khan
・ Liaquat Ali Khan's state visit to the United States


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Liapootah Power Station : ウィキペディア英語版
Liapootah Power Station

The Liapootah Power Station is a run-of-the-riverhydroelectric power station located in the Central Highlands region of Tasmania, Australia. The power station is situated on the Lower River Derwent catchment and is owned and operated by Hydro Tasmania.
==Technical details==
Part of the Derwent scheme that comprises eleven hydroelectric power stations, the Liapootah Power Station is the first power station in the lower run-of-river system. The power station is located aboveground below Lake Liapootah. Water from the Derwent below the Tarraleah and Tungatinah Power Station is diverted through a concrete lined tunnel. Lake
Liapootah is very narrow and is considered a run of river storage. During high inflow events the pond level can threaten the Tarraleah Power Station upstream. The drum gate is designed to lower automatically and maintain a maximum pond level below the flood level of Tarraleah station. Having the drum gate installed maximises the head at Liapootah station. The alternative to this would have been to build the dam at a lower level, thus reducing the available output from Liapootah station.〔
The power station was commissioned in 1960 by the Hydro Electric Corporation (TAS) and the station has three English Electric Francis turbines, with a combined generating capacity of of electricity. Within the station building, each turbine has a fully embedded spiral casing and water flow is controlled by a spherical rotary main inlet valve and a turbine relief valve designed to prevent spiral casing overpressure. The station output, estimated to be annually,〔 is fed to Transend Networks’ transmission grid via three banks of 11 kV/220 kV three-phase English Electric generator transformers to the outdoor switchyard.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Liapootah Power Station」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.